Sunday, September 11, 2016

100 Things to Do

Here is our list of 100 things we need to do:

  1. Crew Evals Weeks 1-4
  2. Crew Evals Week 5-8
  3. Crew Evals Week 9-12
  4. Crew Evals Week 13-16
  5. Deadline for Campaign Layout
  6. Campaign Shoot (Shoot #1)
  7. Campaign Edit
  8. Campaign Launch Date
  9. Campaign End Date
  10. Crew Meeting #2
  11. Equipment Check-Out (Shoot #1)
  12. Equipment Return (Shoot #1)
  13. Crew Meeting #3
  14. Crew Meeting #4
  15. Crew Meeting #5
  16. Deadline for two subject bios per person
  17. Campaign End Date
  18. Deadline for pre-production presentation
  19. B-Roll With Sound Mixing Shoot (Shoot #2)
  20. B-Roll With Sound Mixing Edit
  21. Deadline for B-Roll Edit
  22. Equipment Check-Out (Shoot #2)
  23. Equipment Return (Shoot#2)
  24. Expert Interview #1 in Wilmington (Shoot #3)
  25. Expert Interview #1 Edit
  26. Equipment Check-Out (Shoot #3)
  27. Equipment Return (Shoot #3)
  28. Expert Interview #2 in Asheville (Shoot #4)
  29. Expert Interview #2 Edit
  30. Equipment Check-Out (Shoot #4)
  31. Equipment Return (Shoot #4)
  32. Deadline for two interviews edit
  33. Expert Interview #3 in Shelby (tentative, Shoot #5)
  34. Expert Interview #3 Edit
  35. Equipment Check-Out (Shoot #5)
  36. Equipment Return (Shoot #5)
  37. VOX Pop + Additional B-Roll (Shoot #6)
  38. VOX Pop + Additional B-Roll Edit
  39. Equipment Check-Out (Shoot #6)
  40. Equipment Return (Shoot #6)
  41. Crew Meeting #6
  42. Crew Meeting #7
  43. Crew Meeting #8
  44. Crew Meeting #9
  45. Crew Meeting #10
  46. Crew Meeting #11
  47. Deadline for third interview edit
  48. Deadline for rough cut
  49. Deadline for marketing & distribution presentation
  50. Deadline for fine cut
  51. Deadline for image lock with sound cut
  52. Back-up shoot dates
  53. Back-up edit dates
  54. Campaign video sound edit
  55. Look into Asheville permit
  56. Shelby permit
  57. Budget food for Shelby
  58. Design campaign video script/outline
  59. Design music for campaign video
  60. Design music for Modern Craft
  61. Shoot B-Roll stills downtown
  62. Design bts video music
  63. Design bts video sound
  64. Edit bts video
  65. Look through public domain music
  66. Praying
  67. Crying
  68. Bonding time (the whole project is bonding time, assbutt) but what I mean is like friendship time sans work
  69. Remind Alan to eat. Force feed him otherwise.
  70. Wiccan do it.
  71. Wiccan finish this list guys.
  72. Remind Jessica to stop being SO FUKKEN RUDE
  73. Look up downtown Wilmington filming permit.
  74. Launch Indiegogo campaign.
  75. Put together shot list for Asheville.
  76. Put together shot list for Shelby shindig.
  77. Budget food for Asheville.
  78. Schedule trips downtown for b-roll.
  79. Discuss sound design for Lady Passion interview.
  80. Discuss sound design for b-roll images.
  81. Create title card for film.
  82. Look up places to eat in Asheville for budgeting purposes.
  83. Share campaign on Facebook.
  84. Confirm last two expert interviews.
  85. Schedule last two expert interviews.
  86. Check-in to Asheville Cabin.
  87. Take headshots for Indiegogo.
  88. Get sunrise shot while in Asheville.
  89. Look at still frame movie shots to possibly include in our documentary.
  90. Check out of Asheville Cabin.
  91. Budget food for Wilmington.
  92. Budget for props.
  93. Buy props for campaign video and other shoots.
  94. Create list of B-roll ideas for Asheville.
  95. Create a “share” schedule for the campaign video.
  96. Prepare equipment before Wilmington shoot.
  97. Prepare equipment before Asheville shoot.
  98. Prepare equipment before Shelby shoot.
  99. Contact Lady Passion about best places to film in Asheville.
  100. Budget for Starbucks.
  101.       Finish 100 List.
  102. Finish the Perks for our indiegogo.
  103. Create a shooting schedule for Asheville.
  104. Create shooting schedule for Wilmington
  105. Create shooting schedule for Shelby.

No comments:

Post a Comment